Skip to content
KraftSonnenEnergie
Industry

PV for industry and manufacturing

We deliver PV projects for industrial operations with high daytime loads, self-consumption potential, and expansion plans — including BESS readiness where relevant.

Pain points

What we typically hear

  • High electricity prices and volatility
  • High daytime loads with good self-consumption potential
  • Limited grid headroom for expansion
  • Little internal bandwidth for project management
Triggers

What initiates projects

  • Capex planning and decarbonisation targets
  • Grid bottlenecks during plant expansion
  • ESG reporting requirements
  • Energy security / resilience
Decision makers

Who we typically engage with

  • Plant manager
  • Technical director
  • Energy manager
  • CFO
Typical scope

What we deliver

  • Pre-feasibility and load profile analysis
  • Engineering pack incl. SLD and BoM
  • Procurement and construction
  • Grid connection and commissioning
  • O&M and reporting

Indicative timeline: Typically 4–9 months from intake to commissioning, depending on complexity and grid connection.

References

Anonymised reference cards

Rooftop photovoltaic system on an industrial building
IndustrialAnonymised
Capacity
1–2 MWp
Region
TR
Year
2022–2023
Role
EPC
  • Engineering
  • Procurement
  • Construction
  • Commissioning

Reference details available under NDA.

Content will be verified before launch
Rooftop photovoltaic system on an industrial building
ManufacturingAnonymised
Capacity
500–750 kWp
Region
TR
Year
2022
Role
EPC
  • Self-consumption
  • Engineering
  • Construction

Reference details available under NDA.

Content will be verified before launch
/images/projects/rooftop-industrial-02.webp