Solar for logistics and warehousing

Logistics roofs are large but complex: structure, fire safety, insurance, tenant/owner setup, grid. We tackle these topics from day one.

Pain points

What we typically hear

  • Tenant/owner tension on self-consumption
  • Sensitive fire-safety and insurance topics
  • Limited grid capacity
  • Fleet charging competing for connection
Triggers

What initiates projects

  • Portfolio upgrades and tenant rollovers
  • Sustainability-linked financing
  • EV fleet rollout
  • Refurbishment cycles
Decision makers

Who we typically engage with

  • Asset managers
  • Development managers
  • Operations
  • ESG leads
Typical scope

What we deliver

  • Roof solar readiness audit
  • Engineering with fire-safety coordination
  • Procurement and construction
  • Grid and commissioning
  • Optional: PV+BESS and EV charging concept

Indicative timeline: Typically 4–8 months — often parallel to tenant rollovers or refurbishment cycles.

References

Anonymised reference cards

Rooftop photovoltaic system on an industrial building
LogisticsAnonymised
Capacity
750 kWp – 1 MWp
Region
TR
Year
2021–2022
Role
EPC
  • Engineering
  • Construction
  • Commissioning

Reference details available under NDA.

Content will be verified before launch
Rooftop photovoltaic system on an industrial building
Cold storageAnonymised
Capacity
250–500 kWp
Region
TR
Year
2023
Role
EPC support
  • Roof load study
  • Construction
  • Commissioning

Reference details available under NDA.

Content will be verified before launch
/images/projects/rooftop-industrial-07.webp